Project Description

Oil Well equipment – Cargo Air Receivers

Air receiver – 2 pieces @ L 11.00 x W 3.20 x H 3.35 m / 28,500 kg

Platform – 2 pieces @ L 3.70 x W 1.80 x H 1.50 mr / 1,250 kg

Ladder – 2 pieces @ L 10 x W 1.3 x H 0.8 m / 1,250 kg

Spares – 1 crate @ L 0.25 x W 0.25 x H 0.10 m / 10 kg

Collection, preparation for airfreight, loading into aircraft, airfreight, landing permits, customs clearance for the cargo and the plane, off-loading (mechanics and technicians mobilised to arrival airport in order to unbolt the air receivers from the shipping saddles and bolt them back to their final saddles), and delivery to (bolted on the final saddles) to discharge site in Oben, Nigeria.

Air charter

Departure OMSJ (Sharjah International Airport) ETD 2330 26112014

Arrival DNPO (Port Harcourt International Airport) ETA 0600 27112014

Aircraft AN 124-100

Clearance and entry permits were obtained through airport security and cargo handling agencies.

Airside passes for personnel and equipment to access airport perimeter were arranged by WELL.

Pre-clearance has been arranged for the aircraft and the cargo.

Customs duty estimated prepaid to Customs for and on behalf of consignee to facilitate timely completion of clearance process and release of the cargo by Nigerian Customs for delivery to final destination in Oben.

Transport means (1 x lowbed and 1 x flatbed) and lifting equipment (mobile cranes) were positioned at arrival airport simultaneously to aircraft landing to perform direct offloading the Air receivers from the aircraft on to transport means within 3 hours free time from demurrage upon plane landing.

Coordinate clearance and  handling operations with various authorities – Customs, FAAN (tarmac and airport perimeter security), NAHCO (airport handling agency), Aircraft handling agent, etc. in Port Harcourt, Nigeria in order to enable all permits and passed are issued to transport means, operators and engineers, the shipment and the aircraft are cleared in a very short time to avoid incurring  aircraft demurrage charges, safely and correctly off0load the heavy, out-of gauge cargo from the aircraft and load / secure on a special transport to destination with poor quality access road to the site.

Cargo and aircraft clearances completed on time; aircraft released to take off without delay and the cargo delivered to final address on time and within budget agreed with customer.

Testimonials

Many thanks to WELL Dubai, WELL Nigeria, Joe-Eboje and Exterran Nigeria team to make this successful timely and safe delivery.

There were challenges but together we made it possible. Congratulations!!

Thanks & Regards,

Suhas Khadke

Exterran Eastern Hemisphere Fze

 

Thanks to everyone.

WELL for ensuring all issues were sorted pretty well and for delivering on their promise.

Best Regards,

Georgina Ikebudu

Supply chain Manager

Exterran Nigeria

 

Dear All –

Let me be the first to CONGRATULATE every one for a JOB WELL DONE! I have always known that we can do it collectively as a team and get the desired result.. and we have just demonstrated that.

Thanks to the WELL team in Dubai for proper coordinating of the Dubai end of things and to the WELL team in Nigeria for timely execution of the Nigeria end regardless of the challenges.

Thanks again for all your supports and remember to always and always WORK SAFE!

Regards,

Casimir

Exterran Nigeria